Client
Guazi
Role in the project
Desginer Manager
Year
2019
Hefei, China
35,000
m
2
Due to the substantial size of this project, covering 35,000 square meters across 6 buildings, we proposed using Archicad (BIM) as the primary production tool. However, since the team was not familiar with the operation of this software, I took on the responsibility of training nearly ten individuals, including two architects, to quickly complete the extensive drawing work. Each building required around 500 drawings, totaling 3000 construction drawings for all buildings combined.